Skip navigation

O&M Form

O&M Form

Form Type: 
O&M Form

OPERATION AND MAINTENANCE INSPECTION REPORT FOR SUNBEAM TIPPLE RECLAMATION PROJECT
   
Inspection Date: --
Inspected By:
Organization:
Start Time (Military Time):
End Time (Military Time):
   
Weather:
   
A. Site Vegetation
Overall condition of vegetation:
Is any reseeding required?
If yes, describe area size and identify location on Site Schematic:
   
B. Wildlife Utilization
Animals sighted or tracks observed:
Invasive plants observed:
Describe any damage caused to treatment system by wildlife (especially muskrats) and required maintenance:
C. Additional Comments
Additional Comments:
   
D. Field Water Monitoring and Sample Collection - add points as necessary
- Not monitored
Water Monitoring
gallonssecondsCalculated Flow (gpm)pHTemp (C)ORPAlkalinity (mg/L)DO (mg/L)Iron (mg/L)CommentsBottle No.Bottle No.(t. metals)Bottle No.(dis. metals)
SBT1