Skip navigation
Project Details
  • Morgan Run 8 Passive Treatment System
    Location Determined by GPS
    Surface
    Passive Treatment System
    Susquehanna
    Clearfield Creek
    Morgan Run

    The purpose of this project was to renew the permits and construct a passive treatment system at the MR 8 discharge in the Morgan Run watershed. The MR-8 site is located on private land adjacent to Morgan Run in Decatur Township, Clearfield County. The project resulted in the installation of a system consisting of two vertical flow ponds (VFP), a drainable limestone bed (DLB), and a constructed wetland.

    2016
    $550,000.00
    $550,000.00
Treatment Technologies
Treatment Technology Quantity of Elements
Aerobic Wetland 1
Drainable Limestone Bed 1
Vertical Flow Pond (VFP) 2