Skip navigation
Project Details
  • Askam Borehole (aka Dundee Wetlands)
    No
    Passive Treatment System
    Susquehanna
    Nanticoke Creek
    Wilkes-Barre West
    Nanticoke Creek

    The Dundee Wetland was built in 1999(?) to treat about 500 gpm out of the Askam Borehole which functioned without a hitch until the borehole collapsed in 12/2008. In 2010, two new boreholes were drilled by US OSM across Dundee Road. The Dundee Wetland was abandoned and a new treatment system consisting of a maelstrom oxidizer and a settling pond was constructed in 6/2013.

    1999
    $300,000.00
    $0.00
Water Quality Data Summary
Sample PointFlow - Field!!(gal/min)pH - Field!!(S.U.)pH - Lab!!(S.U.)ORP - Field!!(mvolts)DO - Field!!(mg/L)Temp - Field!!(C)Cond - Lab!!(umhos/cm)Alkalinity - Field!!(mg/L)Alkalinity - Lab!!(mg/L)Acidity - Lab!!(mg/L)T. Fe  - Lab!!(mg/L)D. Fe - Lab!!(mg/L)T. Mn  - Lab!!(mg/L)D. Mn  - Lab!!(mg/L)T. Al - Lab!!(mg/L)D. Al - Lab!!(mg/L)SO4 - Lab!!(mg/L)TSS - Lab!!(mg/L)
244-A1040.46.074.7235.81.0713.854542.75103.5-59.9724.25--2.52--0.03--3824
244-C701.66.736.5----16.81040--96-6710.92--3.31--0--40315
Treatment Technologies
Treatment Technology Quantity of Elements
Aerobic Wetland 2
Malestrom Oxidizer 1
Settling Pond 1